Full House Refurbishment in Kingston upon Thames

007_2015_Summer_71

A full house refurbishment which included structural alterations and electrical rewiring. The new open plan kitchen and island feature matt white shaker doors with a contrasting black quartz worktop, natural oak flooring was laid throughout the ground floor.

The main bathroom featured minimal vintage metro tiling with matching grout and a silver grey wood effect floor tile. A large basin and wall hung vanity unit sits below an illuminated mirror with no-touch sensor.

We were very impressed with all aspects of the work we had done, right from the initial consultation through to the final fixes three months after completion. During the initial stages we found Leon and Bradley to very helpful as they gave us practical advice and assistance with planning and design. As part of this Jackson helped design the kitchen and bathrooms. Throughout the project they kept us updated and even though the costs escalated this was always due to unforeseen problems with previous poor construction work on the house. Thoroughly recommended and will use again. Duration of work – 60 days. 10/10

Ross Kingston upon Thames

007_2015_Summer_74

007_2015_Summer_73

007_2015_Summer_72

007_2015_Summer_64

007_2015_Summer_66

007_2015_Summer_65

007_2015_Summer_68

007_2015_Summer_75

007_2015_Summer_67

007_2015_Summer_70

007_2015_Summer_69

 

Nov 30, 2015 | Posted by in Recent Work | 0 comments

Add Your Comment

Premium Wordpress Themes by UFO Themes